首页 | 本学科首页   官方微博 | 高级检索  
     

张峰水库大坝左岸塑性混凝土防渗墙施工
引用本文:赵吉学. 张峰水库大坝左岸塑性混凝土防渗墙施工[J]. 山西建筑, 2007, 33(17): 362-363
作者姓名:赵吉学
作者单位:山西省水利水电工程建设监理公司,山西,太原,030002
摘    要:结合工程实例,介绍了塑性混凝土在张峰水库左岸防渗墙施工中的应用,针对塑性混凝土施工中容易出现的质量问题,提出了具体的处理措施,并取得了良好的效果,为其他类似工程提供了参考借鉴。

关 键 词:防渗墙  塑性混凝土  施工  质量控制
文章编号:1009-6825(2007)17-0362-02
修稿时间:2007-01-29

Construction of plastic concrete cut-off wall in left bank of Zhangfeng reservoir
ZHAO Ji-xue. Construction of plastic concrete cut-off wall in left bank of Zhangfeng reservoir[J]. Shanxi Architecture, 2007, 33(17): 362-363
Authors:ZHAO Ji-xue
Affiliation:ZHAO Ji-xue
Abstract:Combined with practical work the application of plastic concrete in cut-off wall construction in the left bank of Zhangfeng reservoir is introduced. According to quality problems frequently encountered in construction corresponding treatment measures are proposed, which receive good treatment effects and provide good references for similar works.
Keywords:cut-off wall   plastic concrete   construction   quality control
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号