串联补偿装置在配电网的参数优化
引用本文:郭胜辉,李程,张健,李义仓,才华,鲍磊,杨兰均.串联补偿装置在配电网的参数优化[J].电力电容器与无功补偿,2021,42(1):45-50.
作者姓名:郭胜辉  李程  张健  李义仓  才华  鲍磊  杨兰均
作者单位:西安交通大学电气工程学院,西安 710049;国网汉中供电公司,陕西 汉中 723000;国网陕西电力科学研究院,西安 710054;国网汉中供电公司,陕西 汉中 723000;国网汉中供电公司,陕西 汉中 723000;国网汉中供电公司,陕西 汉中 723000;西安交通大学电气工程学院,西安 710049
摘    要:近年来,串联补偿装置在配电网中有了更多的应用,需要研究串联补偿装置在配电网中的配置方案,满足配电网在多种状态下的运行需求.但是配电网的负荷是存在较大波动,电力企业希望能在串联补偿装置可以在配电网不同负荷状态下实现降损和改善线路低电压问题.为此,本文建立一种综合考虑配电网负荷运行状态的多目标优化模型,以线损率和电压偏离度...

关 键 词:配电网  串联补偿装置  动态负荷  鲁棒  多目标优化  NSGAII

Parameter Optimization of Series Compensation Device in Distribution Network
GUO Shenghui,LI Cheng,ZHANG Jian,LI Yicang,CAI Hua,BAO Lei,YANG Lanjun.Parameter Optimization of Series Compensation Device in Distribution Network[J].Power Capacitor $ Reactive Power Compensation,2021,42(1):45-50.
Authors:GUO Shenghui  LI Cheng  ZHANG Jian  LI Yicang  CAI Hua  BAO Lei  YANG Lanjun
Affiliation:(School of Electrical Engineering,Xi’an Jiaotong University,Xi’an 710049,China;State Grid Hanzhong Electric Power Company,Shaanxi Hanzhong 723000,China;Shaanxi Electric Power Research Institute,Xi’an 710054,China)
Abstract:In recent years,series compensation device has found more and more application in the distribution network. It is necessary to study the configuration scheme of the series compensation device in the distribution network so to meet the operational requirements of the distribution network in various conditions.However,the load on the distribution network has large fluctuations. Power utilities hope the series compensation device can achieve both loss reduction and low voltage improvement of line at different load conditions of the distribution network. To this end,a kind of mufti-objective optimization model with comprehensive consideration of load operation condition of distribution network is set up in this paper. The line loss rate and voltage deviation are taken as the optimization goal,thereby obtaining the Pareto frontier by NSGA Ⅱ algorithm. Then,the optimization results under arbitrary load rate are obtained from the Pareto solution set by TOPSIS method. The annual power flow calculation of the distribution network is performed for the optimization results under all load rates and the lowest line loss rate is selected as the final optimization scheme. Finally,the model and algorithm are verified and analyzed in the 34-node distribution network example and the robustness of the calculation results is illustrated.
Keywords:distribution network  series compensation device  dynamic load  robust  multi-objective optimization  NSGA Ⅱ