首页 | 本学科首页   官方微博 | 高级检索  
     

软土地区盾构上穿越既有隧道的离心模拟研究
引用本文:黄德中,马险峰,王俊淞,李削云,余龙.软土地区盾构上穿越既有隧道的离心模拟研究[J].岩土工程学报,2012,34(3):520-527.
作者姓名:黄德中  马险峰  王俊淞  李削云  余龙
作者单位:1. 上海隧道工程股份有限公司,上海 200082; 2. 同济大学地下建筑与工程系,上海 200092; 3. 岩土及地下工程教育部重点实验室 , 上海 200092;4.上海隧道工程轨道交通设计研究院,上海 200070
摘    要:随着地铁网络不断完善,新建盾构隧道近距离穿越既有隧道的现象越来越多。盾构近距离穿越既有隧道的影响问题,比常规盾构施工的研究更为复杂。结合上海外滩通道盾构上穿越地铁 2 号线工程,采用离心模型试验与现场实测相结合的方法对盾构上穿越对周围地层及既有隧道的影响进行了研究。文中选用排液法在离心场中模拟盾构施工,在国内首次实现了在不停机状态下模拟隧道开挖卸载、地层损失和注浆过程,并分析了盾构上穿越施工引起的地层、新建隧道与既有隧道的纵向位移变化规律。通过现场实测数据分析了既有隧道在盾构上穿越过程中纵向变形与时程曲线的变化规律。

关 键 词:盾构隧道  上穿越  既有隧道  离心模型试验  现场实测  
收稿时间:2010-11-03

Centrifuge modelling of effects of shield tunnels on existing tunnels in soft clay
HUANG De-zhong,MA Xian-feng,WANG Jun-song,LI Xiao-yun,YU Long.Centrifuge modelling of effects of shield tunnels on existing tunnels in soft clay[J].Chinese Journal of Geotechnical Engineering,2012,34(3):520-527.
Authors:HUANG De-zhong  MA Xian-feng  WANG Jun-song  LI Xiao-yun  YU Long
Affiliation:1. Shanghai Tunnel Engineering Co., Ltd., Shanghai 200082, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 3. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China; 4. Shanghai Tunnel Engineering & Rail Transit Design and Research Institute, Shanghai 200070, China
Abstract:With the rapid development of the subway network,the phenomena of shield tunnels going across the adjacent tunnels are becoming more and more common.The interaction between shield tunneling and nearby tunnels is more complicated than the ordinary shield tunneling in intact soil strata.Based on the project of Shanghai Bund Passage crossing Metro Line 2,the method of centrifuge modeling together with the field measurement is employed to study the effects shield tunneling on nearby strata and existing tunnels.In centrifugal model tests,the effects simulation techniques considering the unloading of excavation,ground loss and grouting are developed to analyze the longitudinal settlement of the shield tunnel and the existing tunnel induced by the shield tunneling.Besides,the deformation distribution and settlement curves of the existing tunnels during shield construction are studied by using the monitoring data.
Keywords:shield tunneling  up-crossing  existing tunnel  centrifugal model test  field measurement
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号