首页 | 本学科首页   官方微博 | 高级检索  
     

面向现代工业园区的电压暂降综合防治方案
引用本文:王建勋,张逸,张嫣,邵振国,黄毅标,杨朝赟.面向现代工业园区的电压暂降综合防治方案[J].电力系统自动化,2020,44(14):156-163.
作者姓名:王建勋  张逸  张嫣  邵振国  黄毅标  杨朝赟
作者单位:1.福州大学电气工程与自动化学院,福建省福州市 350108;2.国网福建省电力有限公司福州供电公司,福建省福州市 350009
基金项目:福建省自然科学基金资助项目(2016J01219)。
摘    要:现代工业园区具有用电量大、敏感设备多、电压等级高等特点,为缓减电压暂降对现代工业园区用户造成的巨大经济损失,克服现有治理方案手段单一、成本高以及可实施性差等不足,提出协调采用电网侧和用户侧治理措施、优化配置切换型与补偿型治理设备的电压暂降综合防治方案。首先,对用户侧多个同类型与不同类型暂降治理设备的性能、成本进行分析,建立各治理设备的成本模型;其次,对输配电线路的改造成本分别进行建模,并建立线路改造后园区年度暂降次数模型;最后,建立综合防治后治理方案的最大净现值目标函数,利用粒子群优化算法求解获得园区最优的暂降治理设备配置方案。通过对某现代工业园区进行实例分析,验证了该方案能综合应用各种治理手段,提高园区电压暂降治理的净现值,具有较好的可行性。

关 键 词:电压暂降  现代工业园区  综合防治  敏感用户  净现值  优化配置
收稿时间:2019/12/10 0:00:00
修稿时间:2020/3/4 0:00:00

Comprehensive Prevention and Control Scheme for Voltage Sag in Modern Industrial Park
WANG Jianxun,ZHANG Yi,ZHANG Yan,SHAO Zhenguo,HUANG Yibiao,YANG Chaoyun.Comprehensive Prevention and Control Scheme for Voltage Sag in Modern Industrial Park[J].Automation of Electric Power Systems,2020,44(14):156-163.
Authors:WANG Jianxun  ZHANG Yi  ZHANG Yan  SHAO Zhenguo  HUANG Yibiao  YANG Chaoyun
Affiliation:1.College of Electrical Engineering and Automation, Fuzhou University, Fuzhou 350108, China;2.Fuzhou Electric Power Supply Company of State Grid Fujian Electric Power Co., Ltd., Fuzhou 350009, China
Abstract:The modern industrial park has the characteristics of large power consumption, considerable number of sensitive equipment and high voltage level. In order to mitigate the huge financial losses due to voltage sags, and overcome the shortcomings of single measures, high cost and poor feasibility of existing control schemes, a comprehensive prevention and control scheme for voltage sag is proposed to coordinate control measures on the grid and user sides, and optimize the configuration of switching-type and compensation-type control equipment. Firstly, the performance and cost of the same and different types of control equipment on the user side are analyzed, and the cost model of each control equipment is established. Secondly, the reconstruction cost of transmission and distribution lines are modeled separately, and then the annual voltage sag times of the park after reconstruction is modeled. Finally, the objective function of the maximum net present value of comprehensive prevention and control scheme is established, and the particle swarm optimization algorithm is used to solve the optimal configuration scheme of control equipment in the park. Through an example analysis of a modern industrial park, it is proved that the scheme can apply various control means comprehensively to improve the net present value of voltage sag control in the park, and has a good feasibility.
Keywords:voltage sag  modern industrial park  comprehensive prevention and control  sensitive user  net present value  optimal configuration
本文献已被 CNKI 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号