盾构近距离穿越重大管线施工技术研究
引用本文:程文锋. 盾构近距离穿越重大管线施工技术研究[J]. 安徽建筑, 2007, 14(2): 29-31
作者姓名:程文锋
作者单位:中铁四局集团第二工程公司,安徽,阜阳,236028
摘    要:在盾构法地铁隧道施工中,盾构近距离穿越重大管线是一个常见的现象.也是困扰施工单位的一个难题。文章结合工程实例,主要介绍盾构在近距离穿越地下管线时所采取的施工措施,为类似工程提供参考。

关 键 词:盾构  近距离  重大管线  扰动  变形
文章编号:1007-7359(2007)02-0029-03
修稿时间:2006-12-01

Study on Shield Driving Construction Near Arterial Pipelines
Cheng Wenfeng. Study on Shield Driving Construction Near Arterial Pipelines[J]. Anhui Architecture, 2007, 14(2): 29-31
Authors:Cheng Wenfeng
Affiliation:The Second Engineering Co., Ltd. of CTCE Group, Fuyang 236028, China
Abstract:In subway tunnel construction by shield driving method, it is a common phenomenon as well as a difficulty for the construction parties to drive near the arterial pipelines. In combination with a project, this paper mainly introduces the construction measures applied to the similar project for reference.
Keywords:shield driving  near  arterial pipeline  disturbance  deformation