万家寨引黄联接段汾河水库取水工程进水塔沉井施工
引用本文:陈青芳.万家寨引黄联接段汾河水库取水工程进水塔沉井施工[J].山西水利科技,2007(3):34-35.
作者姓名:陈青芳
作者单位:山西省万家寨引黄工程总公司太原分公司,太原,030012
摘    要:万家寨引黄联接段汾河水库取水工程在进水塔施工过程中,采用了沉井施工方法,该方法为进水塔施工在汾河水库正常运行的情况下施工提供了良好的施工条件,文中详细介绍了进水塔沉井施工方法。

关 键 词:沉井  施工  进水塔  万家寨引黄工程
文章编号:1006-8139(2007)03-34-02
修稿时间:2007-01-12

Constructing Open Caisson of Inlet Water Tower in Connection Works of YRDP
CHEN Qing-fang.Constructing Open Caisson of Inlet Water Tower in Connection Works of YRDP[J].Shanxi Hydrotechnics,2007(3):34-35.
Authors:CHEN Qing-fang
Affiliation:CHEN Qing-fang
Abstract:The open caisson method was adopted during the construction of inlet water tower in connection works of YRDP.The tower is located in Fenhe Reservoir.Under the condition of normal running of Fenhe Reservoir,this method guaranteed the good construction condition.This paper introduces detailed construction method of open caisson of inlet water tower.
Keywords:Open caisson construction inlet water tower The Yellow River Diversion Project of Wanjiazhai(YRDP)