首页 | 本学科首页   官方微博 | 高级检索  
     

峡江水电站机组选型与可行性分析
引用本文:王颖,付鹏.峡江水电站机组选型与可行性分析[J].江西水利科技,2012,38(1):29-31.
作者姓名:王颖  付鹏
作者单位:江西省峡江水利枢纽工程管理局,江西南昌,330046
摘    要:根据峡江水电站参数,结合低水头特性,峡江水电站机组选型为灯泡贯流式机组.本文从水轮机模型试验结果及制造与设计难度分析机组的可行性.

关 键 词:峡江水利枢纽  水电站  灯泡贯流式机组  水轮机模型试验

The unit selection and feasibility analysis of Xiajiang Hydraulic Project
WANG Ying , FU Peng.The unit selection and feasibility analysis of Xiajiang Hydraulic Project[J].Jiangxi Hydraulic Science & Technology,2012,38(1):29-31.
Authors:WANG Ying  FU Peng
Affiliation:(Xiajiang Hydraulic Engineering Administration of Jiangxi Province,Nanchang 330046,China)
Abstract:Based on the low water-head characteristics of Xiajiang Hydraulic Project,the bulb tubular unit is selected as the generating unit of this project.The unit feasibility is analyzed from the turbine model test result and its difficulty of design and manufacture.
Keywords:Xiajiang Hydraulic Project  Bulb tubular unit  Turbine model test
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号