首页 | 本学科首页   官方微博 | 高级检索  
     

悬索桥上部结构施工成品保护的探讨与研究
引用本文:梁彬彬,杜洪池,梁进达. 悬索桥上部结构施工成品保护的探讨与研究[J]. 工程质量, 2013, 31(6): 1-4
作者姓名:梁彬彬  杜洪池  梁进达
作者单位:中交二公局第二工程有限公司,陕西西安,710119
摘    要:随着中国桥梁技术的飞速发展,悬索桥已成为大跨径桥梁的主载,而悬索桥上部结构安装过程中如何做好对成品结构的保护成为我们共同面对的课题。成品保护是在悬索桥上部结构安装过程中最大限度地消除和避免对下部基础混凝土结构及上部构件造成污染和损伤,在达到精细施工的同时提高主桥成品外观质量。

关 键 词:悬索桥  上部结构安装  成品保护

Discussion and Research of Finished Product Protection for Upper Structure of Rope Suspension Bridge
LIANG Binbin , DU Hongchi , LIANG Jinda. Discussion and Research of Finished Product Protection for Upper Structure of Rope Suspension Bridge[J]. Quality of Civil Engineering and Construction, 2013, 31(6): 1-4
Authors:LIANG Binbin    DU Hongchi    LIANG Jinda
Affiliation:(CCCC second highway engineering Co.,Ltd.,Xian Shannxi 710119,China)
Abstract:The rope suspension bridge have been became dominate along with the fast development of Chinese bridge technology.The finished upper structure protection is the common question during installation of upper structure of rope suspension bridge.The finished product protection during installation of upper structure of rope suspension bridge can eliminate and avoid pollution and damnify for the base concrete structure and the upper structure,fine construction while improve the aspect quality.
Keywords:rope suspension bridge  upper structure installation  finished product protection
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号