首页 | 本学科首页   官方微博 | 高级检索  
     

《混凝土结构工程施工规范》GB50666—2011编制简介——冬期、高温和雨期施工
引用本文:李景芳,朱广祥,李宏伟,李小阳. 《混凝土结构工程施工规范》GB50666—2011编制简介——冬期、高温和雨期施工[J]. 施工技术, 2012, 41(6): 20-23
作者姓名:李景芳  朱广祥  李宏伟  李小阳
作者单位:1. 中国建筑股份有限公司技术中心,北京,101300
2. 黑龙江省寒地建筑科学研究院,黑龙江哈尔滨,150080
3. 浙江省长城建设集团股份有限公司,浙江杭州,310016
4. 中国建筑科学研究院,北京,100013
摘    要:《混凝土结构工程施工规范》GB50666—2011第10章分一般规定、冬期施工、高温施工、雨期施工,共4节41条。与《混凝土结构工程施工及验收规范》GB50204—92比较,增加了高温施工和雨期施工内容,将原版中冬期钢筋施工调到钢筋工程章节。冬期施工介绍了气温界限的确定、混凝土热工计算的重要性、水泥选用、外加剂选用、原材料预热、混凝土养护等内容;高温施工介绍了进入高温的条件、高温施工专项方案、施工措施等;雨期施工介绍了施工过程质量控制、安全控制等内容。

关 键 词:混凝土结构  施工  冬期  高温  雨期

Introduction of Code for Construction of Concrete Structures GB50666-2011:Construction in Cold, Hot and Rainy Weather
Li Jingfang , Zhu Guangxiang , Li Hongwei , Li Xiaoyang. Introduction of Code for Construction of Concrete Structures GB50666-2011:Construction in Cold, Hot and Rainy Weather[J]. Construction Technology, 2012, 41(6): 20-23
Authors:Li Jingfang    Zhu Guangxiang    Li Hongwei    Li Xiaoyang
Affiliation:1.Technology Center of China State Construction Engineering Corporation,Beijing 101300,China; 2.Heilongjiang Province Academy of Cold Area Building Research,Harbin,Heilongjiang 150080,China; 3.Zhejiang Greatwall Construction Group Co.,Ltd.,Hangzhou,Zhejiang 310016,China; 4.China Academy of Building Research,Beijing 100013,China)
Abstract:The chapter Ⅹ of Code for construction of concrete structures GB50666—2011 includes aspects of general requirements,cold weather requirements,hot weather requirements and rainy weather requirements,which adds the contents of hot weather and rainy weather construction.Furthermore,compared with Code for construction and acceptance of concrete structures GB50204—92,the part of steel bar construction in cold weather is placed in steel bar engineering chapter.The assurance of temperature limit,importance of thermal calculation of concrete,selection of cement,selection of admixture,preheating of original material and maintenance of concrete are introduced for cold weather construction.The joining condition in hot weather,the special scheme and construction measures for hot weather construction are indicated.The quality control and safety control during construction for rainy weather construction are described.
Keywords:concrete structures  construction  cold weather  hot weather  rainy weather
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号