首页 | 本学科首页   官方微博 | 高级检索  
     

山区地质高层建筑地下室逆作法施工技术
引用本文:冯军.山区地质高层建筑地下室逆作法施工技术[J].施工技术,2000,29(1):33-35.
作者姓名:冯军
作者单位:重庆市渝万建设集团,重庆,404040
摘    要:从实践中摸索出山区地质条件下高层建筑地下室利用工程结构循序渐近由上而下挖土形成基坑混凝土挡土结构的施工方法,在施工过程中,不会危及相邻建筑及工程结构的安全,同时优化了梁柱节点,给施工带来方便。

关 键 词:山区地质  高层建筑  地下室  竖井口  逆作法
文章编号:1002-8498(2000)01-0033-02
修稿时间:1999-03-11

Reverse Construction Method for the Basement of High-rise Building in Mountain-area
FENG Jun.Reverse Construction Method for the Basement of High-rise Building in Mountain-area[J].Construction Technology,2000,29(1):33-35.
Authors:FENG Jun
Abstract:The consturction method of forming concrete retaining wall in foundation pit step by step by excavating from top to bottom with the application of the structures for the basement of high-rise building in the geology conditions of mountain-areas. In the course of construction, it will not threaten the safety of structural buildings nearby while optimizing beam-column panel and bringing convenience to construction.
Keywords:mountain  area geology  high  rise building  basement  rim of shaft  reverse construction method  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号