基于电网需求响应约束的多播路由
引用本文:龙丹,李晓卉,丁月民.基于电网需求响应约束的多播路由[J].计算机应用,2018,38(4):1102-1105.
作者姓名:龙丹  李晓卉  丁月民
作者单位:1. 武汉科技大学 信息科学与工程学院, 湖北 武汉 430081;2. 天津理工大学 计算机科学与工程学院, 天津 300384
基金项目:国家自然科学基金资助项目(61702369);天津市科委项目(15JCYBJC52400)。
摘    要:针对智能电网多播路由通信中,通常存在只考虑多播通信的时延约束而没有考虑电网需求侧带负载的情况,所构建的多播树会出现控制信息传输到大功率负载设备的通信时延较大的问题,提出一种考虑负载功率和通信时延的多播树构造方法,称为基于需求响应(DR)能力约束的多播路由算法。首先,根据电网拓扑信息生成满足约束条件的完全图;然后,采用Prim算法构造较低费用的多播树;最后,将多播树还原到原网络。仿真结果表明该算法能够有效地减小大功率负载设备的需求响应时延,与基于时延约束的多播路由算法相比,能够使电网频率波动大幅度减小。该算法能够有效地提高智能电网中需求响应的实时性,稳定电网频率。

关 键 词:多播路由算法  智能电网  负载功率  时延  需求响应能力  
收稿时间:2017-09-21
修稿时间:2017-11-26

Multicast routing of power grid based on demand response constraints
LONG Dan,LI Xiaohui,DING Yuemin.Multicast routing of power grid based on demand response constraints[J].journal of Computer Applications,2018,38(4):1102-1105.
Authors:LONG Dan  LI Xiaohui  DING Yuemin
Affiliation:1. College of Information Science and Engineering, Wuhan University of Science and Technology, Wuhan Hubei 430081, China;2. School of Computer Science and Engineering, Tianjin University of Technology, Tianjin 300384, China
Abstract:In multicast routing comunication of smart grid, concerning the long communication delay of multicast tree when transmitting control messages to high-power load device, which caused by only considering delay constraint without considering the demand of smart grid, a new multicast tree construction method that considered load and comunication delay at the same time was proposed, namely multicast routing algorithm based on Demand Response (DR) capability constraint. Firstly, a complete graph satisfying the constraint was generated according to the grid network topology. Then, a lower-cost multicast tree was constructed by using the Prim algorithm. Finally, the multicast tree was restored to the original network. The simulation results show that the proposed algorithm can effectively reduce the demand response delay of high-power load devices, and can significantly reduce the power frequency deviation compared with the multicast routing algorithm only considering delay constraint. This algorithm can actually improve the real-time demand response in the smart grid and stabilize the grid frequency.
Keywords:multicast routing algorithm                                                                                                                        smart grid                                                                                                                        load power                                                                                                                        delay                                                                                                                        Demand Response (DR) capability