用于水厂微水头发电的灯泡贯流式水轮机开发 |
| |
作者姓名: | 盛立君 郑 源 杨春霞 李玲玉 |
| |
作者单位: | 1. 河海大学水利水电学院,南京,210098 2. 河海大学能源与电气学院,南京,210098 |
| |
基金项目: | 国家自然科学基金资助项目/ 大型混流式水轮机尾水管水力振动研究0 ( 51076041) |
| |
摘 要: | 在自来水供水过程中,存在着一些依靠水位差进行自流供水的环节。随着常规水能资源逐渐被开发殆尽,利用这部分微水头进行发电受到了关注。由于水厂工况基本不变、装置场地复杂多样等原因,常规水轮机并不适用,因此,开发新型水轮机就势在必行。结合某自来水厂安装灯泡贯流式水轮机进行发电的案例,通过传统水轮机设计理论对其进行设计,并运用计算流体动力学软件,选择SIMPLEC算法,采用基于雷诺平均N-S方程的Spalart-Allmaras湍流模型对该水轮机进行数值模拟和优化,得出在不影响水厂原有水处理工艺的前提下,在水厂安装水轮发电机组利用微水头进行发电从而达到节能减排目的的较优方案。
|
关 键 词: | 自来水厂 污水厂 微水头 开发 灯泡贯流式 数值模拟 节能 |
Development of bulb tubular turbine used in micro2waterhead hydropower generation in Water Plants |
| |
Authors: | SHENG Li-jun ZHENG Yuan YANG Chun-x i LI Ling-y u |
| |
Affiliation: | 1. College of Water Conser v ancy and H y dr op ow er , H ohai Univers ity , Nanj ing 210098, China;
2. College of Ener gy and Electr ic Eng ineer ing , H ohai Univer sity , N anj ing 210098, China |
| |
Abstract: | During the w ater supply process, there are some certain conduit s in w hich w ater ar e dr iven by nat ur al w ater head
differ ence. With the g radual depletion o f convent ional hy dr opow er resour ces, mo re and mo re attention has been paid to the pre2
v iously neg lected micro2water head hydro pow er g eneratio n. Given t he fact that the wo rking conditio n is r elatively stable and the
situat ion of the installatio n sit e is complicat ed, the conventio nal hydraulic turbines may no t be applicable, thus dev elopment of
new types o f tur bines that suit the r equir ements of power g ener atio n in water plants is needed. In this paper, a bulb tubular tur2
bine w as develo ped fo r the hydro power g ener ation in a water plant. The conventio nal theor y of turbine design w as used to desig n
the new t ur bine. The numerica l simulation and optimizatio n of the bulb tubula r turbine w ere per formed using t he comput at ional
fluid dy namics softw ar e, the SIMPLEC a lg orithm, and the Spalart2Allmar as turbulence mo del based o n the Reynolds time2aver2
ag ed N2S equations. A better design of micro2water head hy dr opow er generation in w ater plant s w as pro po sed in or der to achiev e
the g oal of energ y conservat ion and emissio n r eduction w ithout posing any t hr eat to the safety and r eliability of previous w ater
treatment process. |
| |
Keywords: | waterwo rks sew ag e plants micr o2w aterhead development bulb tubular tur bine numerical simulation energ y con2
serv atio n |
本文献已被 万方数据 等数据库收录! |
| 点击此处可从《》浏览原始摘要信息 |
|
点击此处可从《》下载全文 |
|