首页 | 本学科首页   官方微博 | 高级检索  
     

牛栏江天花板水电站截流施工设计方案综述
引用本文:罗德胜. 牛栏江天花板水电站截流施工设计方案综述[J]. 云南水力发电, 2008, 24(5): 87-89
作者姓名:罗德胜
作者单位:云南滇能(集团)控股公司昭通工程建设指挥部,云南,昭通,657000
摘    要:从天花板水电站工程截流时段、截流流量选择及截流施工规划等进行截流施工设计,通过截流施工的实施,说明该施工设计方案是合理的。在截流中,采取一定的工程技术和管理措施降低了截流难度。

关 键 词:牛栏江  水电站  截流  施工设计  戗堤

Summary of the River Closure Construction Design for Tianhuaban Hydropower Project on the Niulanjiang River
LUO De-sheng. Summary of the River Closure Construction Design for Tianhuaban Hydropower Project on the Niulanjiang River[J]. Yunnan Water Power, 2008, 24(5): 87-89
Authors:LUO De-sheng
Affiliation:LUO De - sheng (Zhaotong Project Construction Headquarters, Yunnan Dianneng(Group) Holding Company, Zhaotong 657000, Yunnan, China)
Abstract:The construction practice of river closure has proved that the design of the river closure is successful in terms of selection of duration and discharge for river closure as well as construction planning for river closure for construction of Tianhuaban hydropower project on the Niulanjiang river.Certain technical and managerial measures were taken to lessen the difficulty in the river closure during river closure.
Keywords:the Niulanjiang River  hydropower project  river closure  construction design  berm