扩大单元接线中发电机断路器并联电容器设置方案探讨
引用本文:赵水荣.扩大单元接线中发电机断路器并联电容器设置方案探讨[J].大坝与安全,2003(4):55-56.
作者姓名:赵水荣
作者单位:紧水滩水力发电厂,浙江丽水,323000
摘    要:本文针对发电机—变压器组扩大单元接线中发电机断路器并联电容器设置方式在运行中存在的问题,提出调整电容器设置使系统可靠运行的方案。

关 键 词:扩大单元接线  发电机中性点  消弧线圈  补偿度  发电机断路器
文章编号:1671-1092(2003)04-0055-02
修稿时间:2003年5月12日

On parallel connection capacitor setup of generator circuit breaker in enlarged unit connection
Zhao Shuirong//Jin-shuitan Hydropower Plant.On parallel connection capacitor setup of generator circuit breaker in enlarged unit connection[J].Large Dam & Safety,2003(4):55-56.
Authors:Zhao Shuirong//Jin-shuitan Hydropower Plant
Affiliation:Zhao Shuirong//Jin-shuitan Hydropower Plant
Abstract:This article has come up with the scheme of adjusting capacitor setup to make system safe operation based on the defects of capacitor parallel connection setup of generator circuit breaker in enlarging unit connection of generator and transformer group.
Keywords:enlarging unit connection  generator neutral point  arc absorbing coil  compensation degree  generator circuit breaker