首页 | 本学科首页   官方微博 | 高级检索  
     

韶钢30MnSi管桩钢筋盘条的控制冷却工艺
引用本文:徐顺根.韶钢30MnSi管桩钢筋盘条的控制冷却工艺[J].南方金属,2007(5):33-35.
作者姓名:徐顺根
作者单位:广东省韶关钢铁集团有限公司,广东,韶关,512123
摘    要:阐述了韶钢30MnSi管桩钢筋盘条的控制冷却工艺方法,探讨30MnSi管桩钢筋的技术要求、控制冷却工艺特点,并设计了30MnSi管桩钢筋盘条的控制冷却工艺.

关 键 词:30MnSi管桩钢筋盘条  控制冷却  力学性能  韶钢  管桩钢筋  盘条  控制冷却工艺  piles  pipe  controlled  cooling  设计  工艺特点  技术要求  工艺方法  阐述
文章编号:1009-9700(2007)05-0033-03
修稿时间:2007-02-06

A discussion on the controlled cooling of 30MnSi bar for pipe piles
XU Shun-gen.A discussion on the controlled cooling of 30MnSi bar for pipe piles[J].Southern Metals,2007(5):33-35.
Authors:XU Shun-gen
Abstract:The basis of controlled cooling technique of 30MnSi pre -stressed concrete wire for pipe pile is expatiated, the technical requirements for 30MnSi bars and the features of the controlled cooling itself discussed, and the specific controlled cooling procedure designed as well in the paper.
Keywords:30MnSi bar for pipe pile  controlled cooling  mechanical property
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号