首页 | 本学科首页   官方微博 | 高级检索  
     


Monitoring of corrosion processes in chloride contaminated mortar by electrochemical measurements and X‐ray tomography
Authors:M Beck  J Goebbels  A Burkert  B Isecke  R Bäßler
Affiliation:BAM Federal Institute for Materials Research und Testing, Unter den Eichen 87, 12205 Berlin (Germany)
Abstract:Corrosion of steel reinforcement in concrete exposed to chloride containing environments is a serious problem in civil engineering practice. Electrochemical methods, e.g., potential mapping, provide information whether the steel reinforcement is still passive or depassivation has been initiated. By applying such techniques no information on the type of corrosion, its extent and distribution of corrosion products is available. Particular the corrosion progress is a significant problem. Especially in the case of macrocell corrosion in reinforced concrete structures, the development at the anode cannot be separated into corrosion damage resulting from macrocell corrosion or self‐corrosion. Until now also in laboratory tests it is impossible to collect such information without destroying specimens after electrochemical testing was performed. To overcome this problem it was tried to study the steel surface within the mortar specimens by X‐ray tomography (CT). Within the scope of these investigations it could be shown, that X‐ray tomography is suitable to make corrosion pits and their development visible which are embedded in a mortar with a cover thickness of about 35 mm. In this publication the time‐dependent corrosion damage of reinforced steel is documented by X‐ray tomography.
Keywords:contaminated mortar  electrochemical measurements  pitting corrosion  X‐ray tomography
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号