大型制冷机组的冲洗与调试
引用本文:李志生,李利新,梅胜,李冬梅,王小霞.大型制冷机组的冲洗与调试[J].建筑热能通风空调,2006,25(4):95-99.
作者姓名:李志生  李利新  梅胜  李冬梅  王小霞
作者单位:广东工业大学建设学院;中国科学院广州能源研究所
摘    要:大型制冷机组部件众多,管路比较复杂,又是必须承受高压的容器,安装、调试都有严格的要求。以30HXC165A制冷机组的现场冲洗、调试为例,详细介绍了大型制冷机组在试运行之前标准的准备工作。这些工作包括吹扫、试压、排污、充注制冷剂和冲洗调试等全部过程及注意事项。本文为大型螺杆式制冷机组这种压力容器设备的运行和维护管理提供了工程实践经验。结果表明:在施工调试过程中,只有各方互相协调,并且严格按照相关文件和规范要求才能顺利完成制冷机组的安装调试,为以后的正常运行打下基础。

关 键 词:制冷机组  气密性实验  冲洗  调试
文章编号:1003-0344(2006)04-095-5
收稿时间:2005-11-10
修稿时间:2005-11-10

Flushing and Commissioning about Large-scale Chiller Units
Li Zhisheng,Li Lixin,Mei Sheng,Li Dongmei,Wang Xiaoxia.Flushing and Commissioning about Large-scale Chiller Units[J].Building Energy & Environment,2006,25(4):95-99.
Authors:Li Zhisheng  Li Lixin  Mei Sheng  Li Dongmei  Wang Xiaoxia
Affiliation:1. School of construction, Guangdong University of Technology; 2 .Guangzhou Institute of Energy Conversion, Chinese Academy of Sciences
Abstract:Strict requirements must be met during the installation and commissioning program for the large-scale chiller units since it has multitudinous components and complicated pipelines with high-pressure vessels.Preparation program was present in detail for large-scale chiller units before commissioning as the example of 30HXC165A chiller units.The total arrangement was considered about chiller units in terms of blowing,pressure trial,drainage,refrigerant filling,flushing and commissioning.The paper also provides the operation and maintenance engineering experience for large-scale screw chiller units.The results indicate that installation and commissioning can be achieved only strict abidance the related regulations demand based on harmony of all engineering participants(owners,engineering,providers etc.).Furthermore,favorable installation and commissioning work can provide the reliable foundation of normal operation.
Keywords:chiller units  air-sealed test  flushing  commissioning