首页 | 本学科首页   官方微博 | 高级检索  
     

龙滩水电站主要机电设备及其布置
引用本文:张培裘.龙滩水电站主要机电设备及其布置[J].红水河,2001,20(2):30-32,36.
作者姓名:张培裘
作者单位:国家电力公司中南勘测设计研究院,
摘    要:龙滩水电站分两期建设,电站水头变幅大,在不增加水轮机额定水头、额定出力和转轮直径的前提下,推荐机组最大容量为700MW,并采用不更换转轮和不改变机组转速的方案。同时推荐发电机压母线选用离相封闭线线;主变压器采用特殊组合三相变压器;50kV高压引线选用干式电缆;500kV配电装置采用GIS。

关 键 词:机电设计  设备布置  龙滩水电站
文章编号:1001-408X(2001)02-0030-04

Essential Mechanico-electrical Equipments and Their Arrangement in LHP
ZHANG Pei-qiu.Essential Mechanico-electrical Equipments and Their Arrangement in LHP[J].Hongshui River,2001,20(2):30-32,36.
Authors:ZHANG Pei-qiu
Abstract:The construction for Longtan porject is divided into two stages. Its water head fluctuation is big. Under the condition of no increase in normal head, normal output and runner diameter of turbine, it is recommended a max. capacity 700 MW without replacement of runner and unit speed. It is also recommended to use separate phase closed generator voltage bus bar; special composite three phase main transformer; dry cable for 500 kV high voltage lead; CIS for 500 kV distribution device.
Keywords:mechanico_electrical design  equipment layout  Longtan hydroelectric project  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号