首页 | 本学科首页   官方微博 | 高级检索  
     


Evaluation of a turbine driven CCHP system for large office buildings under different operating strategies
Authors:Pedro J Mago  Anna K Hueffed
Affiliation:Department of Mechanical Engineering, Mississippi State University, 210 Carpenter Engineering Building, P.O. Box ME, Mississippi State, MS 39762-5925
Abstract:Combined cooling, heating, and power (CCHP) systems use waste heat from on-site electricity generation to meet the thermal demand of the facility. This paper models a CCHP system for a large office building and examines its primary energy consumption (PEC), operational costs, and carbon dioxide emissions (CDE) with respect to a reference building using conventional technologies. The prime mover used in this investigation is a load share turbine, and the CCHP system is evaluated under three different operation strategies: following the electric demand of the facility, following the thermal demand of the facility, and following a seasonal strategy. For the various strategies, the percentages of total carbon dioxide emissions by source are presented. This paper explores the use of carbon credits to show how the reduction in carbon dioxide emissions that is possible from the CCHP system could translate into economic benefits. In addition, the capital costs available for the CCHP system are determined using the simple payback period. Results indicate that for the evaluated office building located in Chicago the CCHP operation reduces the operational cost, PEC, and CDE from the reference building by an average of 2.6%, 12.1%, and 40.6%, respectively, for all the different operational strategies.
Keywords:CHP  combined heating and power  CCHP  combined cooling  heating  and power  PGU  power generation unit (prime mover)  REF  reference building (no CCHP system)
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号