莲花水电站溢洪道弧形工作闸门侧水封改造
引用本文:宋德强,夏春明. 莲花水电站溢洪道弧形工作闸门侧水封改造[J]. 大坝与安全, 2010, 0(1): 66-68
作者姓名:宋德强  夏春明
作者单位:牡丹江水力发电总厂,黑龙江,牡丹江,157000;牡丹江水力发电总厂,黑龙江,牡丹江,157000
摘    要:着重介绍露顶式弧形闸门侧止水采用"L"型止水带在莲花电站的应用情况,解决在东北地区冬季气温低时,闸门门叶钢结构和闸墩混凝土结构同时收缩出现漏水问题,确保了溢洪道弧形工作闸门冬季安全可靠运行。

关 键 词:弧形闸门侧止水  "  L"  型止水带  莲花电站

Renovation of side water seal on radial gate of spillway at Lianhua dam
SONG De-qiang,XIA Chun-ming. Renovation of side water seal on radial gate of spillway at Lianhua dam[J]. Large Dam & Safety, 2010, 0(1): 66-68
Authors:SONG De-qiang  XIA Chun-ming
Affiliation:SONG De-qiang and XIA Chun-ming Mu-danjiang Hydropower Plant
Abstract:The paper introduced the application of the water seal belt in the shape ″L″on the radial gate of the spillway at Lianhua hydropower station.It solved the leakage problem caused by the coinstantaneous contraction of the gate and the concrete of the pier induced by cold weather,worthy reference.
Keywords:side water seal on the radial gate  the water seal belt in the shape ″L″  Lianhua hydropower station