首页 | 本学科首页   官方微博 | 高级检索  
     

5MW低功率堆燃料元件厂内运输
引用本文:章子才 姚士彬. 5MW低功率堆燃料元件厂内运输[J]. 核动力工程, 1992, 13(4): 44-48
作者姓名:章子才 姚士彬
作者单位:中国核动力研究设计院 成都(章子才,姚士彬,唐学仁,黄明太),中国核动力研究设计院 成都(董渝生)
摘    要:本文介绍了采用干式运输工艺将 HFETR 卸料元件运抵5MW 低功率堆(5MW LPR)的厂内运输技术及其安全分析。给出了5MW LPR 首炉装料的32盒 HFETR 卸料元件的运输实践结果。

关 键 词:低功率 元件 运输 反应堆

Fuel Elements Transport within the Plant for 5MW Low Power Reactor
Zhang Zicai,Yao Shibin,Tang Xueren,Huang Mingtai,Dong Yusheng. Fuel Elements Transport within the Plant for 5MW Low Power Reactor[J]. Nuclear Power Engineering, 1992, 13(4): 44-48
Authors:Zhang Zicai  Yao Shibin  Tang Xueren  Huang Mingtai  Dong Yusheng
Abstract:This paper describes a dry transport technique and its safeanalysis for the HFETR discharged fuel elements transportedwithin the plant.The paper also gives results of transporting 32boxes of HFETR discharged fuel elements first loaded in the5MW LPR.
Keywords:5MW Low Power Reactor  Discharged fuel element  Plumbum pot  Forklift truck  Transport within the plant
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号