首页 | 本学科首页   官方微博 | 高级检索  
     


A simultaneous planning of production and scheduling operations in flexible flow shops: case study of tile industry
Authors:Reza Ramezanian  Sahar Fallah Sanami  Mohsen Shafiei Nikabadi
Affiliation:1.Department of Industrial Engineering,K.N. Toosi University of Technology,Tehran,Iran;2.Department of Economic and Management,Semnan University,Semnan,Iran
Abstract:The aim of this paper is to study a simultaneous lot-sizing and scheduling in multi-product, multi-period flexible flow shop environments. A new mixed integer programming (MIP) model is proposed to formulate the problem. The objective function includes the total cost of production, inventory, and external supply. In this study, in case of not meeting the demand of customers, this demand should be met by foreign suppliers in higher price. Due to the high computational complexity of the studied problem, a rolling horizon heuristic (RHH) and particle swarm optimization algorithm (PSO) are implemented to solve the problem. These algorithms find a feasible and near-optimal from production planning and scheduling. Additionally, Taguchi method is conducted to calibrate the parameters of the PSO algorithm and select the optimal levels of the influential factors. The computational results show that the algorithms are capable of achieving results with good quality in a reasonable time and PSO has better objective values in comparison with RHH. Also, the real case study for tile industry with real features is applied. Sensitivity analysis is used to evaluate the performance of the model.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号