深孔爆破在深井坚硬复合顶板沿空留巷强制放顶中的应用
引用本文:高魁,刘泽功,刘健,邓东生,高新亚,康亚,黄凯峰.深孔爆破在深井坚硬复合顶板沿空留巷强制放顶中的应用[J].岩石力学与工程学报,2013,32(8):1588-1594.
作者姓名:高魁  刘泽功  刘健  邓东生  高新亚  康亚  黄凯峰
作者单位:(1. 安徽理工大学 能源与安全学院,安徽 淮南 232001;2. 安徽理工大学 煤矿安全高效开采省部共建教育部重点实验室,安徽 淮南 232001; 3. 安徽理工大学 深部煤炭开采与环境保护国家重点实验室,安徽 淮南 232001;4. 淮南矿业集团有限责任公司 潘一矿东区,安徽 淮南 232001)
基金项目:国家自然科学基金资助项目(51004003,50974004);安徽省教育厅自然科学基金重点项目(KJ2010A091)
摘    要: 为防止深井坚硬顶板沿空留巷的充填墙体在顶板垮落时被压坏,特采取深孔爆破强制放顶来释放顶板压力以提高沿空留巷的护巷效果。通过数值模拟和理论分析的方法,阐述深孔爆破强制放顶的卸压机制。炸药在坚硬岩体中爆破,爆破孔周边的岩体受爆轰应力波作用产生大量裂隙并发生大幅度位移,使爆破孔周围的应力重新分布,厚层顶板垮落,降低了巷旁充填墙体的附加载荷,从而起到护巷作用。最后,在潘一矿东区1252(1)工作面进行超前深孔爆破强制放顶的现场应用,在经历工作面回采和充填留巷稳定阶段后,墙体整体维护效果良好,对类似条件下沿空留巷强制放顶具有很好的借鉴意义。

关 键 词:采矿工程深孔爆破深井坚硬复合顶板沿空留巷强制放顶
收稿时间:2013-01-24

APPLICATION OF DEEP BOREHOLE BLASTING TO GOB-SIDE ENTRY RETAINING FORCED ROOF CAVING IN HARD AND COMPOUND ROOF DEEP WELL
GAO Kui,LIU Zegong,LIU Jian,DENG Dongsheng,GAO Xinya,KANG Ya,HUANG Kaifeng.APPLICATION OF DEEP BOREHOLE BLASTING TO GOB-SIDE ENTRY RETAINING FORCED ROOF CAVING IN HARD AND COMPOUND ROOF DEEP WELL[J].Chinese Journal of Rock Mechanics and Engineering,2013,32(8):1588-1594.
Authors:GAO Kui  LIU Zegong  LIU Jian  DENG Dongsheng  GAO Xinya  KANG Ya  HUANG Kaifeng
Affiliation:1(1.School of Mining and Safety Engineering,Anhui University of Science and Technology,Huainan,Anhui 232001,China;2.Key Laboratory of Mine Safety and High Efficient Mining Jointly Built by Province and Education Ministry,Anhui University of Science and Technology,Huainan,Anhui 232001,China;3.State Key Laboratory of Deep Coal Mining and Environmental Protection,Anhui University of Science and Technology,Huainan,Anhui 232001,China;4.East Area of Panyi Coal Mine,Huainan Mining Group Co.,Ltd.,Huainan,Anhui 232001,China)
Abstract:In order to prevent the filling wall along gob-side entry retaining being crushed when roof caves in deep well,the deep borehole blasting forced roof caving was taken to release the roof pressure and improve the supporting roadway gob-side entry retaining effect. The pressure relief mechanism of deep borehole blasting to forced roof caving was expounded by numerical simulation and theoretical analysis method. After dynamite blasting in hard rock,the surrounding rock of blasting boreholes produces a large number of fissures and the significant displacement by the explosion stress waves;and stresses were redistributed. So the additional load of filling body and the deformation of the surrounding rock were reduced which play the role of supporting roadway. Finally,in the working face 1252(1) of eastern area of Panyi coal mine,the deep borehole blasting was applied to forced roof caving field test;and the filling wall kept stable after mining. It provides a good reference for gob-side entry retaining under similar conditions.
Keywords:mining engineering  deep borehole blasting  deep well  hard and compound roof  gob-side entry retaining  forced roof caving