西石门铁矿深部矿体开拓方案的选择
引用本文:陈超,杨丽.西石门铁矿深部矿体开拓方案的选择[J].工程设计与建设,1997(1).
作者姓名:陈超  杨丽
作者单位:邯邢冶金矿山管理局
摘    要:论述了二期深部矿体开采的提升方案,根据地质储量、采矿能力、资金和建设进度等因素,确定延深40m开采,用盲斜井高强度胶带机与现箕斗竖井接力提升矿石,延深2#副井作辅助提升

关 键 词:深部矿体  提升方案  选择

Selection of development scheme of deep ore body in Xishimen iron mine
Authors:Chen Chao
Affiliation:Chen Chao et al.
Abstract:The hoisting scheme of Ⅱ phase of deep mining was discussed. Based on the geologic resources, mining capacity, construction schedule as well as financing condition, it is decided that the mining works will deepened by 40 meters, using blind incline high tensile belt conveyer for ore hoisting following the existing skip hoist, and the auxiliary shaft №2 will deepened for subsidiary hoisting.
Keywords:Deep ore body  Hoisting  scheme  Selection