首页 | 本学科首页   官方微博 | 高级检索  
     

基于未确知测度理论的基坑边坡稳定性评价
引用本文:刘汉露,李新生,谢冬洲,毛明浩,曹伟忠. 基于未确知测度理论的基坑边坡稳定性评价[J]. 河北工程大学学报(自然科学版), 2019, 36(1): 11-16
作者姓名:刘汉露  李新生  谢冬洲  毛明浩  曹伟忠
作者单位:长安大学地质工程与测绘学院;西安铁一院工程咨询监理有限责任公司;陕西长嘉工程建设有限公司
基金项目:国家自然科学基金(41372330)
摘    要:影响基坑边坡稳定的不确定性因素较多,如基坑规模、场地岩土体性质、施工质量、环境因素等。为了探索科学合理的基坑边坡的稳定性评价方法,本文基于未确知测度理论,选取了基坑深度、支护方式、主要土层粘聚力、主要土层内摩擦角、地下水及地表水作用、邻近荷载、邻近荷载坑边距、施工质量八个因素作为评价指标,利用三标度法结合层次分析法确定各指标权重,建立基坑边坡稳定性评价模型。将此模型应用于两个基坑工程实例,对比实际监测结果,评价结果的可靠度较高。结果表明,基于未确知测度理论的基坑边坡稳定性评价模型具有可行性。

关 键 词:基坑边坡  稳定性  未确知测度理论  评价模型
收稿时间:2018-12-02

Stability Evaluation of Foundation Pit Based on Unascertained Measure Theory
LIU Hanlu,LI Xinsheng,XIE Dongzhou,MAO Minghao and CAO Weizhong. Stability Evaluation of Foundation Pit Based on Unascertained Measure Theory[J]. Journal of Hebei University of Engineering(Natural Science Edition), 2019, 36(1): 11-16
Authors:LIU Hanlu  LI Xinsheng  XIE Dongzhou  MAO Minghao  CAO Weizhong
Affiliation:College of Geology Engineering and Surveying, Chang''an University, Xi''an Shaanxi 710000, China,College of Geology Engineering and Surveying, Chang''an University, Xi''an Shaanxi 710000, China,College of Geology Engineering and Surveying, Chang''an University, Xi''an Shaanxi 710000, China,Xi''an Engineering Consultancy & Supervision Co. Ltd. FSDI, Xi''an Shaanxi 710016, China and Shaanxi Changjia Construction Engineering Co., Ltd. Xi''an Shaanxi 710001, China
Abstract:There are many uncertainties affecting the stability of the foundation pit, such as the size of the foundation pit, the soil properties of the site, construction quality, and environmental factors. In order to explore a scientific and rational method for evaluating the stability of foundation pit slopes, based on the unascertained measure theory, this paper selects the depth of foundation pits, supporting methods, main soil layer cohesion, main soil internal friction angle, groundwater and surface, water effect, adjacent load, adjacent load pit margin, and construction quality as evaluation indicators. The weight of each index is determined by using the three-scale method combined with the analytic hierarchy process.The stability evaluation model of the foundation pit is established. This model is applied to two examples of foundation pit engineering. Compared with actual monitoring results, the reliability of evaluation results is credible. The results show that the foundation slope stability evaluation model based on unascertained measurement theory is feasible.
Keywords:foundation pit slope  stability  unascertained measure theory  evaluation model
本文献已被 CNKI 等数据库收录!
点击此处可从《河北工程大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《河北工程大学学报(自然科学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号