瀑布沟水电站机组安装关键工期及综合措施研究
引用本文:胡卫,李林. 瀑布沟水电站机组安装关键工期及综合措施研究[J]. 水电站机电技术, 2005, 28(6): 31-33
作者姓名:胡卫  李林
作者单位:国电大渡河水电开发有限公司,四川,成都,610016;国电大渡河水电开发有限公司,四川,成都,610016
摘    要:结合瀑布沟机组结构特点和现行安装工艺要求及目前水电施工队伍的机电安装水平对瀑布沟水电站水力发电机组安装工期进行预测分析并就如何加快机组安装进度确保按期投产发电提出相应综合措施。

关 键 词:瀑布沟  大型水力发电机组  安装工期分析  措施

Study on installation period and measures for units of Pubugou Hydropower Station
HU Wei,LI Lin. Study on installation period and measures for units of Pubugou Hydropower Station[J]. , 2005, 28(6): 31-33
Authors:HU Wei  LI Lin
Abstract:According to the unit structure characters and installing specifications as well as the current technical level of the construction teams, the installation periods of the units in Pubugou Hydropower Station are predicted and analyzed. The appropriate measures are proposed in order to speed up the pace of the unit installation and ensure going into operation on schedule.
Keywords:Pubugou Hydropower Station  large hydroelectric generating sets  installation period and measures