首页 | 本学科首页   官方微博 | 高级检索  
     

长安金矿无底柱分段崩落法首采中段损失贫化控制方法
引用本文:张秀华,周宗红,丁文俊,刘永文,鄢 波.长安金矿无底柱分段崩落法首采中段损失贫化控制方法[J].有色金属(矿山部分),2023,75(1):20-25.
作者姓名:张秀华  周宗红  丁文俊  刘永文  鄢 波
作者单位:昆明理工大学 国土资源工程学院,昆明理工大学 国土资源工程学院,昆明理工大学 国土资源工程学院,云南黄金集团 金平长安矿业有限公司,云南黄金集团 金平长安矿业有限公司
基金项目:国家自然科学基金资助项目(51864023)
摘    要:长安金矿露天转入地下开采,采用无底柱分段崩落法,出现覆盖层形成困难的问题,且现场矿岩物理力学性质相似,较难区分,使得矿石损失贫化不易控制。为此,设计3种试验方案对3个分段在不同出矿量、不同贫化率条件下展开室内放矿试验研究,优选放矿方案并提出了量化控制方法。试验结果表明:方案1视在回收率和回贫差均高于方案2;其留下的矿石垫层厚度最大,且废石混入率、矿石贫化率均比方案2和方案3低,综合分析方案1为最优方案。首采分段出矿控制有利于保持矿岩界面均匀下降,能够有效缓解覆盖层厚度不足的问题。分析方案1第2分段可知,放出矿量控制在65%~70%时,可以有效地降低矿石贫化率;结合矿石当次品位和当次贫化率随放出矿量的变化关系式,提出了对放出矿量进行相应的量化控制从而有效地降低矿石损失贫化的方法。试验结果在长安金矿1 518、1 509、1 500 m等分段得到实践应用,效果良好,对类似矿山有一定的参考意义。

关 键 词:无底柱分段崩落法  截止品位放矿  相似模拟试验  损失  贫化  控制放矿
收稿时间:2022/7/14 0:00:00
修稿时间:2022/8/19 0:00:00

Depletion control method for loss in the middle section of first mining by bottomless column segmental crumbling method at Chang'an gold mine
Authors:ZHANG Xiuhu  ZHOU Zonghong  DING Wenjun  LIU Yongwen and YAN Bo
Affiliation:Faculty of Land Resources Engineering, Kunming University of Science and Technology,Faculty of Land Resources Engineering, Kunming University of Science and Technology,Faculty of Land Resources Engineering, Kunming University of Science and Technology,Jinping Changan Mining Co, Ltd, Jinping County Yunnan , China),Jinping Changan Mining Co, Ltd, Jinping County Yunnan , China)
Abstract:During the process of open-pit to underground mining in Chang''an gold mine, the bottomless column segmental crumbling method is used, the problem of difficult formation of overburden layer, and the physical and mechanical properties of the site ore rocks are similar, more difficult to distinguish, and making ore loss depletion is not easy to control. To the end, three experimental schemes were designed to carry out indoor release experiments for three segments with different ore output and depletion rates, to optimize the release scheme, and to propose a quantitative control method. The experimental results show that the apparent recovery rate and poor recovery difference of Scheme 1 are higher than those of Scheme 2; the thickness of the ore bedding left by it is the largest, and the waste rock mixing rate and ore depletion rate are lower than those of Scheme 2 and Scheme 3, and Scheme 1 is the optimal scheme in a comprehensive analysis. The first mining section out of control is conducive to maintaining a uniform descent of the ore rock interface, which can effectively alleviate the problem of insufficient overburden thickness. The analysis of the second section of Option 1 shows that the ore release controlled at 65%-70% can effectively reduce the ore depletion rate; combined with the variation equation of current grade and current depletion rate of ore with the ore release, the method of quantifying the ore release control accordingly to effectively reduce the ore loss depletion is proposed. The experimental results were practically applied in each mining site of 1 518 m, 1 509 m, and 1 500 m sections of Chang''an gold mine, with good results, which have reference significance for similar mines.
Keywords:bottomless column segmental crumbling method  cut-off grade release  similar simulation test  loss  depletion  controlled mine release
点击此处可从《有色金属(矿山部分)》浏览原始摘要信息
点击此处可从《有色金属(矿山部分)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏