首页 | 本学科首页   官方微博 | 高级检索  
     

土石坝加固混凝土防渗墙底水力坡降分析
引用本文:李焱,;高江林.土石坝加固混凝土防渗墙底水力坡降分析[J].江西水利科技,2014(4):262-265.
作者姓名:李焱  ;高江林
作者单位:[1]江西省水利科学研究院,江西南昌330029; [2]江西省水工安全工程技术研究中心,江西南昌330029
基金项目:江西省科技厅水利科技项目(KT201301)
摘    要:本文总结了江西省主要应用的几种土石坝加固防渗方案,结合工程实例,利用有限元软件分析了几种防渗方案下防渗墙底部的水力坡降.分析结果表明:在坝前水头相等的情况下,墙前布置"压浆板"的防渗方案可使防渗墙底水力坡降最小,从安全的角度来讲,此方案最优.

关 键 词:防渗墙底  高喷灌浆  水力坡降  土石坝

Analysis on hydraulic gradient at the bottom of the concrete cutoff walls in strengthening earthrock dams
Affiliation:LI Yan, GAO Jiang-lin (1.Jiangxi Provincial Institute of Water Sciences, Nanchang 330029, China; 2.Jiangxi Provincial Engineering Technology Research Center on Hydraulic Structures, Nanchang 330029, China)
Abstract:Several treatment ways of the connection passages between the bottom of the cutoff wall and grouting curtain on strengthening earth clams in Jiangxi province were summarized in this paper. Based on a practical project, the hydraulic gradient of the bottlm of the cutoff wall on the treatment ways of the connection passage was analyzed by the finite element software. The result shows: In a certain upstream water head, the scheme which put a cementing-wall in front of the grouting curtain can make the lowest hydraulic gradient in the bottom of the cutoff wall and is the best solution in the viewpoint of safety.
Keywords:Bottom of the cutoff wall  High pressure jet grouting~ Hidraulic gradient  Earthrock dam
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号