越南松邦4水电站大坝碾压混凝土快速施工方案
引用本文:朱小林. 越南松邦4水电站大坝碾压混凝土快速施工方案[J]. 黑龙江水利科技, 2013, 0(10): 44-48
作者姓名:朱小林
作者单位:中国水电第八工程局有限公司,长沙410007
摘    要:越南松邦4水电站采用碾压混昆凝土大坝,工程具有资金不足、材料供应短缺、合同条件苛刻、工期紧、施工条件复杂等特点.为保证工程按期完工,承建施工方采取对骨料加工、混凝土拌制、混凝土人仓、单仓浇筑高程、模板制安等进行优化配备,旨在与碾压混凝土筑坝工艺相匹配,力求简便、经济,从而达到混凝土快速施工的目的.

关 键 词:碾压混凝土  施工方案  优化配置  快速施工  越南松邦4大坝

Fast Construction Scheme of Roller Compacted Concrete Dam for Songbang No.4 Hydropower Station in Vietnam
ZHU Xiao-lin. Fast Construction Scheme of Roller Compacted Concrete Dam for Songbang No.4 Hydropower Station in Vietnam[J]. Heilongjiang Science and Technology of Water Conservancy, 2013, 0(10): 44-48
Authors:ZHU Xiao-lin
Affiliation:ZHU Xiao-lin ( Hydrochina No. 8 Engineering Bureau Limited Corporation, Changsha 410007, China)
Abstract:TVietnam Songbang No. 4 Hydropower Station is a roller compacted concrete dam. The construction is featured by fund and material shortage, strict conditions in the contract, tight construction schedule and complicated construction conditions. In order to complete the construction on time, contractor optimized aggregate processing, concrete mixing, concrete pouring, single placement elevation, manufacture and installation of template in order to match the RCC dam construction process, and realize fast construction with simple and cost-saving method.
Keywords:roller compacted concrete  construction scheme  optimal allocation  fast construction  Vietnam Songbang No. 4 Dam