首页 | 本学科首页   官方微博 | 高级检索  
     

腾龙桥二级水电站进水口结构布置设计
引用本文:夏军忠,苏秀娟.腾龙桥二级水电站进水口结构布置设计[J].云南水力发电,2014(1):36-38.
作者姓名:夏军忠  苏秀娟
作者单位:云南省水利水电勘测设计研究院,云南 昆明,650021
摘    要:介绍腾龙桥二级水电站进水口结构布置设计,进水口布置于重力坝坝身段,通过坝内埋管后接厂房。将大坝、发电引水及厂房结合为一体,减少工程占地范围,节约投资,方便运行中的大坝、厂房管理。

关 键 词:电站取水口  坝内埋管  水力结构计算

The Design of the Intake Structure Layout of the Tenglongqiao -II Hydropower Project
Affiliation:XIA Jun--zhong, SU Xiu--juan (Yunnan Provincial Water Conservancy and Hydropower Survey Design and Research Institute, Kunming, Yunnan 650021, China)
Abstract:The paper gives an introduction to the design of the power intake structure layout of the Ten-glongqiao -II hydropower project .The intake is placed in the gravity dam body section and connected with the powerhouse through the embedded pipe in the dam .The integration of the dam ,the power tunnel and the powerhouse in the layout reduces the use area of land ,saves investment and facilitates the management of both the dam and the powerhouse in operation .
Keywords:power intake  pipe embedded in the dam  hydraulic structure calculation
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号