首页 | 本学科首页   官方微博 | 高级检索  
     

长沙排污工程大口径玻璃钢夹砂管顶管施工技术
引用本文:李双红,刘士诚. 长沙排污工程大口径玻璃钢夹砂管顶管施工技术[J]. 云南水力发电, 2012, 28(1): 43-49
作者姓名:李双红  刘士诚
作者单位:中国水利水电第十四工程局有限公司路桥市政工程分公司,云南昆明,650051
摘    要:长沙圭塘河西岸截污干管工程设计为顶管,施工作业面移入地下。顶管施工的关键在于管道轴线、高程控制,机头前端开挖、机头进洞、顶进纠偏和注浆减阻等技术措施得到合理的运用。长沙圭塘河西岸截污干管工程各项指标均控制在设计和施工验收规范范围以内,取得了良好的社会效益和经济效益,该工程已于2009年年底投入运行,情况良好。

关 键 词:长沙圭塘河西岸截污干管工程  大口径玻璃钢夹砂管  顶管  施工技术

Large Diameter Glass Fabric Reinforced Plastic Silt-laden Pipe Jacking Technology in Construction of the Sewage Project in Changsha
LI Shuang-hong , TAN Jin-long. Large Diameter Glass Fabric Reinforced Plastic Silt-laden Pipe Jacking Technology in Construction of the Sewage Project in Changsha[J]. Yunnan Water Power, 2012, 28(1): 43-49
Authors:LI Shuang-hong    TAN Jin-long
Affiliation:LI Shuang-hong,TAN Jin-long(Road,Bridge and Municipal Engineering Branch,SINOHYDRO 14 BUREAU CO.,LTD.Kunming 650051,Yunnan,China)
Abstract:The main sewage pipe project of the western bank sewerage of the Guitanghe River in Changsha City is designed to be installed using jacking technology,which means that the working face should be shifted underground.The crux of the pipe jacking technology in construction is to apply such technical measures in a proper way as control of pipe line axis and elevation,leading excavation,entering the tunnel and advancing of the driving machine,deviation correction of jacking and advancing as well as resistance reducing of grout injection.All the indexes of the main sewage pipe project of the western bank sewerage of the Guitanghe River in Changsha City meet both design and construction specifications for acceptance,achieving good social and economical benefits.The project has been under sound operation since the end of 2009.
Keywords:main sewage pipe project of the western bank sewerage of the Guitanghe River in Changsha City  large diameter glass fabric reinforced plastic silt-laden pipe  pipe jacking  construction technology