首页 | 本学科首页   官方微博 | 高级检索  
     

龙滩水电站碾压混凝土坝应力应变、渗流安全监测设计布置与实施
引用本文:徐辉,谢基祥.龙滩水电站碾压混凝土坝应力应变、渗流安全监测设计布置与实施[J].大坝与安全,2007(4):4-7.
作者姓名:徐辉  谢基祥
作者单位:1. 龙滩水电开发有限公司工程建设部,广西,天峨,547300
2. 中国水利水电第七工程局龙滩水电站安全监测项目部,广西,天峨,547300
摘    要:详细介绍了龙滩水电站大坝安全监测的应力应变和渗流监测系统,并从仪器选型、仪器埋设质量和施工方法等方面对设计布置进行了实施.

关 键 词:大坝  监测设计布置  实施  龙滩水电站
文章编号:1671-1092(2007)04-0004-04
修稿时间:2007-05-31

Strain,stress and seepage safety monitoring at Longtan roller compacted concrete dam
XU Hui,XIE Ji-xiang.Strain,stress and seepage safety monitoring at Longtan roller compacted concrete dam[J].Large Dam & Safety,2007(4):4-7.
Authors:XU Hui  XIE Ji-xiang
Affiliation:XU Hui and XIE Ji-xiang Longtan Hydropower Development Co.Ltd
Abstract:This paper introduced the strain,stress and seepage safety monitoring system at Longtan reservoir dam.The construction was carried out in the aspects such as the type of instruments,the embed quality and construction method.
Keywords:dam  arrangement of monitoring design  construction  Longtan hydropower station
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号