首页 | 本学科首页   官方微博 | 高级检索  
     

提高我国水利水电工程质量对策的初步探讨
引用本文:文伏波 郑守仁. 提高我国水利水电工程质量对策的初步探讨[J]. 人民长江, 1998, 29(9): 1-3
作者姓名:文伏波 郑守仁
作者单位:长江水利委员会技术委员会
摘    要:80年代以来,我国水利水电工程建设由于种种原因,如建设体制,管理水平、设计水平、施工水平等,致使部分工程质量出现滑坡,相继出现了垮坝、引水隧洞混凝土衬砌坍塌等严重质量事故。针对我国当前水电工程质量滑坡的现象,借鉴隔河岩水利枢纽工程质量好,工期短,严要求,明确各方职责权,工程质量的对策措施:业主应把创建优质工程作为主要目标放在首位,坚持高标准、严要求,明确各方职责权,协调各方并调动其积极性。设计是工

关 键 词:质量管理 工程质量 水利工程 水力发电工程

On countermeasures for improving quality of water conservancy & hydropower projects in China
Wen Fubo Zheng Shouren. On countermeasures for improving quality of water conservancy & hydropower projects in China[J]. Yangtze River, 1998, 29(9): 1-3
Authors:Wen Fubo Zheng Shouren
Affiliation:Wen Fubo Zheng Shouren
Abstract:Since 1980s,for a variety of reasons in construction system,management ability,design and construction levels,the quality of partial works in Chinese water conservancy & hydropower project construction has been poor,resulting in serious quality accidents such as dam failure and intake tunnel concrete liner collapse etc.In the light of the situation of hydropower project quality being on the decline in China,drawing on the experience of the Geheyan Project for reference,which is high in engineering quality,short in construction time,and saving in cost,the following countermeasures for improving the engineering quality of our country are put forward:(1) Owners should aim at achieving a high quality project as major objective,and place it before everything else,upholding the high standard and strict requirements,making clear the duties and rights of each side concerned,coordinating relationship among all relevant sides and bringing every positive factor into play.(2) Design is the soul of project construction,and a high quality project must be founded on an excellent design.Design units should strengthen the field representative work,select the professional persons in charge to construction site for long term residence,so as to revise the design according to actual conditions,perfect and optimize the design continuously.(3) For a large scale water conservancy & hydropower project,to implement the design integration system is favorable for continuity of investigation,design and scientific research work.(4) Contractors should put the quality control in the first place,strengthening management to achieve the efficiency and keep up with the schedule,and establishing the sound quality guarantee system.(5) Construction supervision units should continuously enhance the supervisors' level of competence,cooperate closely with designers,and put the engineering quality supervision in the first place.
Keywords:Quality management Engineering management Hydraulic Project Hydroelectric power engineering  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号