梁合拢段施工技术(二)
引用本文:邱式中.梁合拢段施工技术(二)[J].预应力技术,2003,7(3):8-12.
作者姓名:邱式中
作者单位:上海市基础工程公司
摘    要:3)桥面拖运用5吨慢速卷扬机做动力,6/8″钢丝绳、走口(2只六门葫芦对穿钢丝绳)作牵引,7.5厘米无缝钢管做走管,在道木(16×22×250cm)上缓慢移动至要求位置。 2、吊梁吊装就位 1)2榀40米长(?)型弦杆万能杆件承重梁的结构型式及其拼装见图7。

关 键 词:桥面  承重梁  工程施工  托梁  荷载  桁架

Beam closing section construction technology (2)
Shizhong Qiu.Beam closing section construction technology (2)[J].Prestress Technology,2003,7(3):8-12.
Authors:Shizhong Qiu
Affiliation:Shanghai Foundation Engineering Company
Abstract:3) The bridge floor is towed with 5 tons of slow winch as power,6/8 "steel wire rope and outlet (2 six-door hoists to wear the steel wire rope) as traction, 7.5cm seamless steel pipe as pipe, and slowly move to the required position on the road (16×22×250cm). 2, lifting beam in place 1)2 pieces of 40 meters long (?) The structural type and assembly of the load-bearing beam of the A-chord universal member are shown in Figure 7.
Keywords:Bridge deck  Bearing beam  Engineering construction  Joists  Load  truss
点击此处可从《预应力技术》浏览原始摘要信息
点击此处可从《预应力技术》下载全文