首页 | 本学科首页   官方微博 | 高级检索  
     


The tricriteria flowshop scheduling problem
Authors:Tamer Eren  Ertan Güner
Affiliation:1. Faculty of Engineering, Department of Industrial Engineering, K?r?kkale University, 71450, K?r?kkale, Turkey
2. Faculty of Engineering and Architecture, Department of Industrial Engineering, Gazi University, 06570, Maltepe, Ankara, Turkey
Abstract:Multicriteria flowshop scheduling problems have been one of the most attractive subjects in recent years. In the multicriteria flowshop scheduling literature, a very limited number of studies have been performed on problems which include a tardiness criterion. In this paper a multicriteria (tricriteria) two-machine flowshop scheduling problem with a tardiness criterion is tackled. The objective is to minimise a weighted sum of total completion time, total tardiness and makespan. An integer programming model is proposed for the problem which belongs to NP-hard class. The modified NEH (Nawaz, Enscore and Ham) algorithm, a tabu search-based heuristic method, random search and the EDD rule (the earliest due date rule) are used to solve problems with up to 2,500 jobs. A computational analysis is conducted to evaluate the performance of the heuristics. The analysis shows that the heuristics are quite efficient, and the performance of the tabu search based heuristic is the best of all in terms of solution quality.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号