首页 | 本学科首页   官方微博 | 高级检索  
     

固定总价合同下清单漏项问题的预防与应对
引用本文:王晶,杨文松,沈杰. 固定总价合同下清单漏项问题的预防与应对[J]. 建筑经济, 2007, 0(Z1)
作者姓名:王晶  杨文松  沈杰
作者单位:东南大学建设与房地产系 江苏南京210096(王晶,沈杰),苏州工业园区置地有限公司 江苏苏州215028(杨文松)
摘    要:着重解决固定总价合同中的工程量清单漏项问题。首先总结漏项问题产生的原因,然后分各种情况解决责任归属问题,最后考虑施工方和建设方如何避免问题发生以及问题发生之后各个阶段的应对措施。

关 键 词:工程量清单  漏项  固定总价合同  预防

Prevention and Countermeasures of Missed Item in Bill of Quantity under Lump Sum Contract
WANG Jing,YANG Wensong,SHEN Jie. Prevention and Countermeasures of Missed Item in Bill of Quantity under Lump Sum Contract[J]. Construction Economy, 2007, 0(Z1)
Authors:WANG Jing  YANG Wensong  SHEN Jie
Abstract:This paper mainly focuses on the problem of missed items in bill of quantity,especially under lump sum contract.Firstly,it analyzes the reasons of item missing;then,points out how to allocate the responsibility;in the end,the paper puts forward the method for avoiding and coping with it.
Keywords:bill of quantity  missed item  lump sum contract  prevention
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号