首页 | 本学科首页   官方微博 | 高级检索  
     

氧化锌阀片分压提取GIS暂态过电压信号
引用本文:唐峰,谢俊文,刘顺桂,黄政,王金皇.氧化锌阀片分压提取GIS暂态过电压信号[J].电测与仪表,2018,55(22):92-95,105.
作者姓名:唐峰  谢俊文  刘顺桂  黄政  王金皇
作者单位:深圳供电局有限公司,深圳供电局有限公司,深圳供电局有限公司,西华大学电气与电子信息学院,西华大学电气与电子信息学院
摘    要:为了在线测量电力系统GIS暂态过电压信号,研制了一款基于氧化锌阀片分压提取暂态过电压信号的装置。首先,介绍了该技术的基本原理;其次,通过ATP-EMTP搭建仿真电路,搭建了氧化锌阀片的分压电路,在暂态过电压、操作过电压和雷电过电压下进行实验,结果表明:在暂态过电压、操作过电压和雷电过电压下,阀片的分压比基本恒定,雷电过电压下波头出现过冲和振荡。最后对氧化锌避雷器进行扫频实验,结果显示在1.5MHz内氧化锌避雷器的频率特性基本不变,并验证了仿真的实用性。此测量技术对电力系统故障分析、电力设备绝缘耐受实验标准制定具有重要的知道意义。

关 键 词:氧化锌阀片  过电压测量  ATP-EMTP  频率响应  GIS
收稿时间:2018/7/27 0:00:00
修稿时间:2018/7/27 0:00:00

Extraction of Transient Overvoltage Signal from GIS by Partial Voltage of Zinc Oxide Valve Sheet
Tang Feng,Xie Junwen,Liu Shungui,Huang Zheng and Jin Huang.Extraction of Transient Overvoltage Signal from GIS by Partial Voltage of Zinc Oxide Valve Sheet[J].Electrical Measurement & Instrumentation,2018,55(22):92-95,105.
Authors:Tang Feng  Xie Junwen  Liu Shungui  Huang Zheng and Jin Huang
Affiliation:Shenzhen Power Supply Co Ltd Shenzhen,Shenzhen Power Supply Co Ltd Shenzhen,Shenzhen Power Supply Co Ltd Shenzhen,Xihua University,Xihua University
Abstract:In order to measure transient overvoltage signal of power system GIS online, a device based on Zinc Oxide valve partial pressure extraction transient overvoltage signal is developed. First, the basic principle of the technology is introduced. Secondly, the simulation circuit is built by ATP-EMTP, and the voltage divider circuit of Zinc Oxide valve is set up. The experiment is carried out under transient overvoltage, operating overvoltage and lightning overvoltage. The results show that the partial pressure ratio of the valve plate under transient overvoltage, operation overvoltage and lightning overvoltage Under constant current, the overshoot and oscillation of the wave head occur under lightning overvoltage. Finally, the Zinc Oxide lightning arrester scavenging experiment is carried out. The results show that the frequency characteristics of the Zinc Oxide arrester in 1.5MHz are basically unchanged, and the practicability of the simulation is verified. This measurement technology is of great significance to the fault analysis of power system and the establishment of insulation tolerance experiment standard for power equipment.
Keywords:Zinc Oxide valve  Overvoltage measurement  ATP-EMTP  frequency response  GIS
点击此处可从《电测与仪表》浏览原始摘要信息
点击此处可从《电测与仪表》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号