首页 | 本学科首页   官方微博 | 高级检索  
     

闭合导线在新桥矿控制网中的工程实践
引用本文:史良贵.闭合导线在新桥矿控制网中的工程实践[J].金属矿山,2006(4):37-38,42.
作者姓名:史良贵
作者单位:安徽省铜陵市新桥矿业公司
摘    要:矿山控制网的建立有其特殊性,山高坡陡、埋点、通视等较为困难,兼之测量控制点必须确保一定的精度,这就给网的布置选择及评定带来一定的难度。通过新桥矿业近井点控制网的测设,讨论了近井网布设的优化问题,同时对测距闭合导线有可能存在的伪闭合现象提出了有针对性的对策。

关 键 词:优化  闭合导线  伪闭合
收稿时间:2006-02-08
修稿时间:2006-02-08

Engineering Practice of Closing Line in Control Net at Xinqian Mine
Shi Lianggui.Engineering Practice of Closing Line in Control Net at Xinqian Mine[J].Metal Mine,2006(4):37-38,42.
Authors:Shi Lianggui
Affiliation:Anhui Tongling Xinqiao Mining Co.
Abstract:The setting up of mine control net has its particularity: high mountain and steep slope make mark setting and through vision rather difficult.The required precision of measurement control net brings difficulty to the selection of net configuration and its appraisal.Through the practice of near shaft-control net at Xinqiao Mine,the optimization of the lay-out of near shaft-net is discussed and the countermeasures for the false closing phenomenon that may exist in the closing line for ranging are proposed.
Keywords:Optimization  Closing line  False closing
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号