岩滩水电站扩建工程尾水出口设计
引用本文:欧龙惠.岩滩水电站扩建工程尾水出口设计[J].红水河,2014(2):19-22.
作者姓名:欧龙惠
作者单位:广西电力工业勘察设计研究院,广西南宁530023
摘    要:岩滩水电站扩建工程尾水出口闸室的布置牵扯到是否影响进一期厂房的交通、是否影响船闸通航、调保计算成果能否满足等问题。为解决这些问题,在场地有限的情况下,首先优化出口闸室的布置,然后通过对出口边坡开挖坡比变陡并进行强支护。

关 键 词:尾水出口  岩滩水电站扩建工程

Tailrace Outlet Design for Extension Project of Yantan Hydropower Station
OU Long-hui.Tailrace Outlet Design for Extension Project of Yantan Hydropower Station[J].Hongshui River,2014(2):19-22.
Authors:OU Long-hui
Affiliation:OU Long-hui (Guangxi Electric Power Industry Investigation Design and Research Institute, Nanning, Guangxi, 530023)
Abstract:The layout of tailrace outlet gate chamber affects not ship lock operation, but also the calculation results of guaranteed only the traffic of further phase powerhouse and the regulation. In order to solve these problems, the lay- out of outlet gate chamber is optimized, the outlet slope excavation ratio is reduced and the slope is strongly supported due to limited space.
Keywords:tailrace outlet  Extension Project of Yantan Hydropower Station