首页 | 本学科首页   官方微博 | 高级检索  
     

测试流量不合理对修正等时试井产能曲线的影响
引用本文:李乐忠,李相方,何东博,石军太.测试流量不合理对修正等时试井产能曲线的影响[J].天然气工业,2010,30(4):67-69.
作者姓名:李乐忠  李相方  何东博  石军太
作者单位:1.中国石油大学石油工程教育部重点实验室;2.中国石油勘探开发研究院
基金项目:国家重点基础研究发展计划(973计划)项目
摘    要:修正等时试井是目前气藏常用的产能试井方法,试井过程中测试流量的选择对试井的结果有着重要的影响。从气体不稳定渗流理论出发,得出每个测试流量存在极限泄流半径的新认识。据此对修正等时试井的理论基础进行了分析研究,得出在试井过程中测试流量的选择对试井的结果有着重要影响的结论,并分析了测试流量过大或过小时修正等时试井产能曲线的形态及误差。进而指出修正等时试井的适用范围,提出了修正等时试井应该根据储层物性确定测试流量的原则。研究成果对完善修正等时试井测试气井产能方法具有指导意义。

关 键 词:修正等时试井  测试  流量  泄流半径  产能评价  曲线  影响

Impact of irrational tested flow rate on the deliverability curve of the modified isochronal test
Li Lezhong , Li Xiangfang , He Dongbo , Shi Juntai.Impact of irrational tested flow rate on the deliverability curve of the modified isochronal test[J].Natural Gas Industry,2010,30(4):67-69.
Authors:Li Lezhong  Li Xiangfang  He Dongbo  Shi Juntai
Affiliation:1.Key Laboratory of Petroleum Engineering, Ministry of Education, China University of Petroleum, Beijing 102249, China; 2.Petroleum Exploration & Development Research Institute, PetroChina, Beijing 100083, China
Abstract:The modified isochronal test is a universal method for deliverability test for a gas reservoir, during which the selection of flow rate test has significant effect on the result of a well test. In this paper, from the theory of the unsteady gas seepage flow, a new recognition that there is a limit on the radius for each test flow rate has been achieved. Based on the new recognition, the theory basis of the modified isochronal test is analyzed, and a conclusion that the selection of flow rate test plays an important role in the test results has been drawn. Furthermore, the shape and error curves for deliverability has been analyzed under the conditions with excessively large or small flow rates to the modified isochronal test, based on which the application scope of the modified isochronal test is shown. Moreover, the modified isochronal test should be based on the principle that the flow rate is determined by the physical properties of reservoirs. This shows an important guiding significance to a well's deliverability test when using the modified isochronal test.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《天然气工业》浏览原始摘要信息
点击此处可从《天然气工业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号