首页 | 本学科首页   官方微博 | 高级检索  
     

116 MW循环流化床热水锅炉密封风系统改造
引用本文:史风林. 116 MW循环流化床热水锅炉密封风系统改造[J]. 黑龙江电力, 2006, 28(4): 314-315
作者姓名:史风林
作者单位:哈尔滨市华能集中供热有限公司,黑龙江,哈尔滨,150026
摘    要:对QXL116-1.6/130/70型116 MW循环流化床热水锅炉落煤管堵煤故障的原因进行了分析,测量了密封风风速,对该炉密封风系统进行了改造,增大了密封风风压和风速,保证了锅炉连续运行.

关 键 词:热水锅炉  密封风系统  改造
文章编号:1002-1663(2006)04-02
收稿时间:2006-07-04
修稿时间:2006-07-04

Modification of seal air system for 116 MW CFB hot water boiler
SHI Fenglin. Modification of seal air system for 116 MW CFB hot water boiler[J]. Heilongjiang Electric Power, 2006, 28(4): 314-315
Authors:SHI Fenglin
Affiliation:Harbin Huaneng Heating - centralized Co. , Ltd, Harbin 150026, China
Abstract:Reasons of coal blockage fault of coal chute for a QXL116 - 1.6/130/70 type CFB hot water boiler were analyzed, the wind speed of sealing air was measured and the seal air system of the boiler was improved by increasing the wind speed and pressure of the sealing air, through which the continues operation of the boiler is ensured.
Keywords:hot water boiler   seal air system    modification
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号