上海市污水治理工程长距离曲线顶管施工
引用本文:韩石忠. 上海市污水治理工程长距离曲线顶管施工[J]. 中国市政工程, 2007, 0(2): 38-39
作者姓名:韩石忠
作者单位:上海市合流工程监理有限公司,上海,200070
摘    要:结合上海污水治理工程大口径长距离曲线顶管的施工,介绍了采用长距离曲线顶管的原因及其施工存在的风险。通过施工实例,分析了施工过程中发生轴线严重偏差的原因,叙述了纠偏的具体措施和纠偏过程。实践验证措施有效,有一定的参考价值。

关 键 词:长距离曲线顶管风险  曲线顶管轴线偏差  曲线管道受力分析  改善受力状况
文章编号:1004-4655(2007)02-0038-02
收稿时间:2007-01-16
修稿时间:2007-01-16

Long-distance Curved Pipe-jacking Construction of Shanghai Sewage Treatment Projects
HAN Shi-zhong. Long-distance Curved Pipe-jacking Construction of Shanghai Sewage Treatment Projects[J]. China Municipal Engineering, 2007, 0(2): 38-39
Authors:HAN Shi-zhong
Abstract:Combined with large diameter long-distance curved pipe-jacking construction of Shanghai sewage treatement projects, the reasons and the risk of long-distance curved pipe-jacking have been introduced in this paper. Through a case, the reasons of serious axis deviation are analyzed; the detailed measures and the process of correcting errors are presented. Finnally, the testing measures are proved to be effective and full of reference va- lues.
Keywords:long-distance curved pipe-jacking risk  curved pipe-jacking axis deviation  force analysis of curved line pipeline  to improve force condition