承钢1号高炉炉壳更换方案探索 |
| |
引用本文: | 郝瑞朝,;商仕金,;高亚男. 承钢1号高炉炉壳更换方案探索[J]. 机械工程与自动化, 2014, 0(5): 187-189 |
| |
作者姓名: | 郝瑞朝, 商仕金, 高亚男 |
| |
作者单位: | [1]河北钢铁集团承钢公司维检中心,河北 承德067002; [2]河北钢铁集团 承钢公司 设备部,河北承德067002 |
| |
摘 要: | 主要探讨了承钢1号高炉炉壳更换方案,通过比较3种方案的优缺点,最终确定了分段更换的施工方案,此方案方便、易行,节约大修成本,在钢铁企业更换高炉炉壳上具有一定参考价值。
|
关 键 词: | 高炉 分段更换 整体推移 |
Furnace Shell Replacement Scheme of No .1 Blast Furnace in Chengde Iron and Steel Company |
| |
Affiliation: | HAO Rui-chao, SHANG Shi-jin, GAO Ya-nan (1. Hebei Iron and Steel Group Chengde Company Maintenance Center, Chengde 067002, China;2. Hebei Iron and Steel Group Chengde Company Equipment Management Department, Chengde 067002, China) |
| |
Abstract: | The scheme of replacing the shell of No .1 blast furnace in Chengde Iron and Steel Company was explored in this paper . The construction method of segment replacement was confirmed finally After comparing the merits and drawbacks of three methods . The method is simple and can save cost .It has guiding significance to similar enterprises . |
| |
Keywords: | blast furnace segment replacement whole replacement |