摘    要:龙羊峡水电站系西北电网的主力发电厂,总装机容量128MW,是以发电为主,兼有防洪、灌溉、防凌等综合效益的水电工程。文章结合龙羊峡水电站2^#变压器中性点故障点查找的过程,对其产生的原因进行了必要的分析,同时提出今后应采取的必要的防护措施。

关 键 词:水电站  变压器  中性点  故障  分析
文章编号:1006-8198(2005)04-0020-03
收稿时间:2004-10-21
修稿时间:2004-10-21

Analysis of Transformer Neutral Point Fault of Longyangxia Hydropower Station
HU Suo-gang. Analysis of Transformer Neutral Point Fault of Longyangxia Hydropower Station[J]. Qinghai Electric Power, 2005, 24(4): 20-22,68
Authors:HU Suo-gang
Affiliation:HU Suo-gang
Abstract:Longyangxia hydropower station is the main generation power plant of the Northwest electric power grid,its total installed capacity is 128MW,and it is a hydraulic power engineering which mainly has the function of generation and also possesses the integrated efficiency of flood-prevention,irrigation.Combining with the process of finding the fault point of the 2# transformer's neutral point of Longyangxia hydropower station,the paper makes an essential analysis of its reason,and puts forward the necessary defending measurement which should be adopted in the future.
Keywords:Hydropower station   Transformer   Neutral point   Fault   Analysis