引用本文:唐兴荣,曲延全.悬索管桥斜拉索转换施工技术[J].施工技术,2004,33(7):39-40.
作者姓名:唐兴荣  曲延全
作者单位:苏州科技学院,江苏,苏州,215011
摘    要:介绍江远东线热网工程悬索管桥斜拉索转换的施工技术 ,在测量、转换等工序中 ,通过采取相应的技术措施 ,有效地实施了受拉状态下斜拉索的转换。

关 键 词:悬索管桥  斜拉索  转换  施工方法
文章编号:1002-8498(2004)07-0039-02
修稿时间:2003年11月28

Construction Technologies of Replacing Stay Cables of a Suspension Cable Pipe Bridge
TANG Xing-rong,QU Yan-quan.Construction Technologies of Replacing Stay Cables of a Suspension Cable Pipe Bridge[J].Construction Technology,2004,33(7):39-40.
Authors:TANG Xing-rong  QU Yan-quan
Abstract:In this article, authors introduce construction technologies of replacing stay cables of a suspension cable pipe bridge of the Far East Line Heat Network project.In working procedures of monitoring,replacing and so forth,engineers adopted relevant technical measures to effectively replacing stay cables which are in a state of tension.
Keywords:suspension cable pipe bridge  stay cable  replace  construction method