用夺吊法分两段吊装反应再生器
引用本文:廖长森.用夺吊法分两段吊装反应再生器[J].石油工程建设,1995,21(5):46-50.
作者姓名:廖长森
作者单位:中油第六建设公司乙烯工程部!河南省濮阳市457000
摘    要:大型设备吊装的方法很多,在中原油田油气综合处理厂30万t/a催化裂化装置“两器”的吊装施工中,针对设备基础高、重量大的特点,考虑施工现场条件和吊装机具的限制,采用双桅杆夺吊法分两段进行吊装,获得成功。本文全面介绍了这种吊装方法。

关 键 词:石油化学工业  设备  吊装  施工

To hoist and install reactive reprocessor in two sections using mast crane
Liao Changsen.To hoist and install reactive reprocessor in two sections using mast crane[J].Petroleum Engineering Construction,1995,21(5):46-50.
Authors:Liao Changsen
Affiliation:Liao Changsen
Abstract:During hoisting and installing a reactive reprocessor of the 300, 000t/a catalytic cracking equipment of the oil and gas treatment plant in Zhongyuan Oil Field, the reactive reprocessor was suceessfully hoisted and installed in two sections using a mast crane in order to counter the problems caused by the height of the equipment foundation and by the heaviness of the equipment.
Keywords:Petro-chenical industry  Equipment  Hoisting  Construction