三峡工程二期围堰运行后的性状分析
引用本文:李青云,程展林.三峡工程二期围堰运行后的性状分析[J].岩土工程学报,2005,27(4):410-413.
作者姓名:李青云  程展林
作者单位:水利部岩土力学与工程重点实验室;水利部岩土力学与工程重点实验室 湖北武汉430010;湖北武汉430010;
摘    要:三峡工程二期围堰安全运行4 a 后于2002 年拆除。在拆除过程中,对堰体和防渗墙进行了调查、取样和相关参数的测试;对风化砂堰体密度、防渗墙材料的工程特性、防渗墙与周边堰体的相互作用模式进行了分析和讨论。

关 键 词:三峡工程  围堰  防渗墙  风化砂  泥皮  
文章编号:1000-4548(2005)04-0410-04

Analysis of the behaviour of stage II cofferdam of TGP
LI Qing-yun,CHENG Zhan-lin.Analysis of the behaviour of stage II cofferdam of TGP[J].Chinese Journal of Geotechnical Engineering,2005,27(4):410-413.
Authors:LI Qing-yun  CHENG Zhan-lin
Affiliation:Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of .Water Resources Wuhan 430010 China
Abstract:Lots of research work including the site investigation, sampling and testing of the cofferdam and its cut-off walls had been done during the period for the removal of stage II cofferdam of TGP. Some key factors are analyzed and discussed based on these results.
Keywords:three gorges project(TGP)  cofferdam  cut-off wall  weathered granite sand  mud layer  