鞍钢6号高炉开炉实践
引用本文:张崇,刘晓璐,朱建伟,王宝海. 鞍钢6号高炉开炉实践[J]. 鞍钢技术, 2002, 0(2): 12-14. DOI: 10.3969/j.issn.1006-4613.2002.02.004
作者姓名:张崇  刘晓璐  朱建伟  王宝海
作者单位:鞍钢炼铁总厂生产技术部,114021;鞍钢新钢铁公司炼铁总厂
摘    要:鞍钢6号高炉2000年12月停炉中修后(2001年3月开炉),设备装备水平明显提高.由于开炉工作准备充分,各环节布置周密,在开炉过程中做到了安全、顺行、高效,47h后风口全部工作,达到全风操作水平,创造了鞍钢高炉开炉恢复的纪录.

关 键 词:高炉  开炉  操作
修稿时间:2001-09-17

Blow-in Practice of No. 6 BF in Angang
Zhang Chong Liu Xiaolu Zhu Jianwei Wang Baohai. Blow-in Practice of No. 6 BF in Angang[J]. Aisc Techniques, 2002, 0(2): 12-14. DOI: 10.3969/j.issn.1006-4613.2002.02.004
Authors:Zhang Chong Liu Xiaolu Zhu Jianwei Wang Baohai
Affiliation:The Ironmaking Plant of Angang New Iron and Steel Co.
Abstract:After intermediate repair of Angang's N0.6 BF in Dec. 2000(blow in in March 2001), the equipment is improved obviously. Due to sufficient preparation work advanced, the blast furnace operation was safe, smooth and high efficient during blow in. All tuyeres work after blow in for 47 hours, so the full blast operation is achieved, which hits the shortest record of BF blow in recovery in Angang.
Keywords:BF blow in operation