首页 | 本学科首页   官方微博 | 高级检索  
     


Optimal Inspection Policy For Multistage Production Process With Alternate Inspection Plans
Authors:Gupta  Ashok Gupta  Hariom
Affiliation:Dept. of Electrical Engineering; Government College of Engineering; Ujjain 456 010 (M.P.) INDIA.;
Abstract:This paper considers a multistage production process with alternate inspection plans. At each stage a number of alternate inspection plans with different cost and reliabilities may be available. Since more reliable inspections are more costly it is essential to find out a compromise between the reliability and cost. A mathematical model is developed. Dynamic programming is used to determine at each stage that out of the available inspection plans (including the case of no inspection) which one will result in minimum s-expected total cost per item.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号