2 500t/d熟料生产线电气安装调试经验
引用本文:张国希. 2 500t/d熟料生产线电气安装调试经验[J]. 水泥工程, 2005, 0(1): 66-70
作者姓名:张国希
作者单位:哈尔滨水泥厂工程部,黑龙江,哈尔滨,150050
摘    要:详细地介绍了哈尔滨水泥厂2500t/d熟料生产线电气自动化安装调试过程中发现的各类电气问题:包括各种高压主机电气设备、水电阻、低压抽屉开关柜和气箱脉冲除尘器电控PLC及其它主要电控设备等在运行中所遇到的各类问题和故障现象。通过多种可能性的分析,介绍了有效解决问题的针对性措施。

关 键 词:熟料 气箱脉冲 生产线 哈尔滨水泥厂 低压 除尘器 电气自动化 开关柜 电气设备 电气安装
文章编号:1007-0389(2005)01-0066-05
修稿时间:2004-05-08

Commission experience of electric equipments in 2 500 t/d clinker production line of Harbin cement plant
ZHANG Guo-xi. Commission experience of electric equipments in 2 500 t/d clinker production line of Harbin cement plant[J]. Cement Engineering, 2005, 0(1): 66-70
Authors:ZHANG Guo-xi
Abstract:All kinds of problems existing in the commision of electric roboticized equipments in 2 500 t/d clinker production line of Harbin cement plant were introduced detailedly in this paper, including problems and malfunction of wirings of various high-voltage main equipments, water resistance, low-voltage drawer switch cabinet, electric control PLC of gas box pulse deduster and other main electric control equipments. Through analysis of different possibility, corresponding measures that could solve the problems effectively were introduced.
Keywords:electric installation  high-voltage main equipment  water resistance  control box  switch cabinet